Pricing & Estimating

Job Estimator At a Glance

Check margin and realized rate before the bid goes out.

Stage 2 · Control5 min readBuilds on Building a Billing Rate Completed

An estimate prices each line of a job by taking its cost and multiplying by a markup. Before the bid goes out, check two things: the gross margin it leaves, and the hourly rates it works out to.

Cost × Markup = Price: where the $1,565 bid goes

Example job · hardscape install, 8 crew hours
  • Job costs $669 · 42.8%
  • Gross profit $896 · 57.2%
Dashed line = 60% gross margin goal

Every line of the bid

Line · what it meansCost × markupPrice
M

Hard Material

Stone, pavers, block and edging installed on the job.

Cost $410 × 2.00×

$820.00

L

Direct Job Labor

8 hrs × $27 = $216 wage + 20% burden ($43.20).

Cost $259.20 · 3.45× on wage

$745.20

M

Material & Chem/Fert

Plants, mulch, soil, chemicals and fertilizer.

Cost $0 × 2.00×

$0.00

E

Equipment Rental

Machines rented in for this job.

Cost $0 × 1.40×

$0.00

S

Subcontractors

Outside trades such as irrigation or lighting.

Cost $0 × 1.50×

$0.00

$

Trash & Other Direct Costs

Dump fees, permits and delivery for this job.

Cost $0 × 1.35×

$0.00

=

Total Installation Revenue

The bid: each line's cost × markup, added up.

Cost $669.20 · 2.34× overall

$1,565.20

Gross ProfitRevenue − direct job cost$896.00
Gross MarginGross Profit ÷ Revenue · goal 60%+2.8 pts below goal57.2%

The hourly rates that tell you if the bid works

Realized rate

$144.40

Revenue left after materials, equipment & subs at cost, per hour. ($1,565.20 − $410) ÷ 8

Labor rate / hr

$93.15

The target billing rate. Realized should beat it. $27 × 3.45

GP per man-hour

$112.00

Gross profit (ex-subs) per crew hour. $896 ÷ 8

Revenue / hour

$195.65

Installation revenue ÷ budget hours

Burdened rate

$32.40

True cost of an hour with taxes and comp. $27 × 1.20

Closing the gap: counting burden drops this job to 57.2%. To reach 60% the labor markup would need to be about 3.95× instead of 3.45×, or the crew hours trimmed. 2.00× on material keeps 50¢ of each dollar; 3.45× on wage keeps about 65¢ once burden is counted.

Check your own bid

Starts with the example hardscape job

Cost × markup = price, line by line

Enter each line's cost and markup. See the bid, its gross margin and the hourly rates before it goes out.

Direct job labor

Other lines: cost ($) and markup (×)

Total installation revenue
Gross profit
Gross margin
Realized rate(Revenue − materials, equipment & subs) ÷ hours
Labor rate / hrWage × markup on wage
GP per man-hourGross profit (ex-subs) ÷ hours
Revenue / hourRevenue ÷ budget hours
Burdened rateWage × (1 + burden)

Free tool · Put this guide to work

Price your next real job with the Job Estimator

Cost × markup on every line, labor burden counted as cost, then a margin and realized-rate check before the bid goes out. Your estimates are private unless you send one to David.

Open the free job estimator
Key idea: Count burden in labor cost, then check margin and realized rate before the bid goes out.

Want every guide in one printable file?

Put your own numbers in

Want David to walk through this with your books?

Every guide uses an example company. A free one-hour consultation puts your real numbers next to it.